Skip to content
SuperarcBook demo
← All case studies

Art Livings Private Limited / CASE STUDY

Five towers. Less repetitive work.

On a five-tower commercial project in Delhi, Art Livings Private Limited used Superarc to streamline documentation and improve consistency across parallel models—completing the documentation workflows in 80% less time.

RESULTS

80%

Less time on the documentation workflows covered in this case study.

Five towers

A consistent approach to drawing production across parallel models.

Aligned outputs

Less repetitive setup and better consistency between drawing packages.

THE CONTEXT

Keeping a complex project moving.

For Art Livings, the commercial project in Delhi brought a familiar production challenge into sharper focus. Documentation tasks that were manageable on one model became a substantial workload when repeated across five towers and multiple drawing series.

The team needed to keep its models and drawing outputs aligned while maintaining a consistent approach to documentation. Superarc helped bring the repeated work into a more coordinated workflow, giving the architects more time for the project rather than the mechanics of producing each package.

The challenge

Repetition multiplied across five models.

The challenge was not one difficult task. It was the volume of familiar tasks repeated across the development, with small differences creating additional coordination work.

  • Repeated documentation: creating views, preparing sheets, placing tags and producing schedules consumed time across towers and drawing series.
  • Complexity at scale: five parallel tower models multiplied the effort required for even straightforward production tasks.
  • Coordination pressure: differences between model information and drawing outputs made consistency harder to maintain across packages.

The solution

A coordinated approach to documentation.

Superarc helped Art Livings streamline the repetitive steps in drawing production and apply a consistent approach across the tower models. View creation, sheet setup, tagging and scheduling became part of a connected workflow instead of a repeated manual exercise.

  • Streamlined high-volume documentation tasks across the defined drawing packages.
  • Supported consistent setup and presentation across the five tower models.
  • Helped align model information and drawing outputs, leaving project-specific coordination and review with the architects.

The impact

More time for coordination. Less time on setup.

Art Livings completed the documentation workflows described here in 80% less time. The reduction addressed the repeated production work across the project, alongside improvements in the consistency of its drawing packages.

For the team, the value extended beyond quicker setup: less effort went into repeating familiar tasks and reconciling differences between outputs. More attention could go to coordination, technical decisions and the quality of the commercial development.

More case studies.

Architecture firm 01Less repetition. More architectural value.Architecture firm 02Keep the design moving. Cut the follow-through.

YOUR NEXT CHAPTER

Make room for
your best work.

Bring a workflow your team repeats. Explore what Superarc can take off your plate.

Book demo